- Built in 1964
- Opened to traffic in 1967
- Original cost for the bridge was $440,740 to construct the piers and $4,828,262 to construct the bridge
- Carried about 140,000 vehicles daily, including 4,760 commercial vehicles
- Scheduled for reconstruction in 2020-25
- Deck steel truss was made up of three parts: the deck, superstructure and substructure
1,907 feet long, 14 spans - Had been inspected annually since 1993; before that, was inspected every two years
Tuesday, August 7, 2007
Fact sheet on the I35 Bridge from Minnesota Department of Transportation
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment